F9A Platform, for Sadra Company (1992)

Description: F9A was a jacket type platform which was built in 1978. During the years, F9A platform was not installed, so in 1991 the project described for Sadra as EPC contractor. The Iranian team including one consulting engineer and the domestic team inside Sadra Co. were studying about it. Amin Ghafooripour & Mr. Abbas Mousavi as the head of offshore – structure department studied on the platform analysis and design as the first offshore job in Iran. However, final design had been carried out by Dr. Galgoul by SACS software, and the mentioned team trained by him.

Type of order: Study about the platform analysis

Owner/Client: Sadra Company – National Iranian offshore oil Company

Ordered by: Sadra Company

Lead Engineer: Mr. Abbas Mousavi

Project manager: Dr. Galgoul

Architect:  N.I.A.

Structural/Civil Eng.: Amin Ghafooripour as the member of Sadra Company

Mech. & Elec. Eng.: N.I.A.

Supervision/Construction: Sadra Company

Contractor: Sadra Company

Location: Persian Gulf

Project size: 1 Jacket type platform

Construction cost: N.I.A.

Engineering Software: SAP 90, SACS, ver. 4

Date of project: 1992