FESTO Pneumatic Factory (2006)

Description: The project carried out for design and retrofit of the main hall for Festo company In Iran. Including:

  • Administrative building
  • Utility Channel
  • Guard House
  • Utility House and Diesel Generator Building
  • Extension of Production Hall
  • Retrofit of Existing Factory Hall

Dog bone connection was used for the administrative building for the first time in Iran as an efficient seismic design.

Type of order: Structural Design-Retrofit of the existing buildings as described.

Owner/Client: FESTO Company-Germany (Iran office).

Ordered by: Dr. Kamran Afshar Naderi Design Office.

Lead Engineer: Dr. Amin Ghafooripour.

Project Manager: Ali Mohammad Moghaddam Tabrizi.

Architect: by client.

Structural/Civil Eng.: Dr. Amin Ghafooripour, A.M.M. Tabrizi, Milad Farahaninia, Nastaran Ashtari, Heydar Abbasi, Fatemeh Ashtari, Hossein Kiamehr, M. Asgari.

Mech. & Elec. Eng.: by client.

Supervision/Construction: Dr.Afshar Naderi office.

Contractor: No information available.

Location: FESTO.

Project size: 2500sqm

Construction cost: by client.

Engineering Software: AutoCAD 2004-SAP 2000-ETABS 2000-Safe2000.

Date of project: 2006