Repair of Bandar Abbas jetty and trestle (2008)

Description: Shavac Co repaired ore Unloading Jetty, trestle located in iron one and mines special Free zone in Bandar Abbas city (in the Persian Gulf). Management of this project and consultancy awarded to  Pars Padir Consulting Engineers, on behalf of Shavac Co. Tehran Berkeley Co. carried out supervision.

Type of order: Structural design and repair

Owner/Client: Special Zone for steel and ores of Persian Gulf – Bandar Abbas

Ordered by: Shavac Co.

Lead Engineer: Dr. Amin Ghafooripour

Project manager: Dr. Amin Ghafooripour

Architect: N.I.A.

Structural/Civil Eng.: Amin Ghafooripour, Fatemeh Ashtari

Mech. & Elec. Eng.: N.I.A.

Supervision/Construction: Tehran Berkeley consulting Eng.

Contractor: Shavac Co.

Location: Special zone for steel & ores – Bandar Abbas – Iran

Project size: N.I.A.

Construction cost: 4.000.000 USD

Engineering Software: N.I.A.

Date of project: 2008

Contact Now